Editing utility guide

File Delivery and Handoff
the unglamorous thing that saves days

Disorganised footage delivery is the single largest source of avoidable cost in editing. Editors bill for the hour spent working out which of four files is the good take, and vendor transitions become month-long ordeals when project files and brand assets live in someone else's account.

Need help with File Delivery and Handoff?

Editors, social managers and marketing teams doing the work in-house: tell us what you want to achieve and where production is getting stuck. We can help with content creation, editing and management, SEO, or Meta and Google Ads.

Share your website, audience, current output and deadline. We’ll discuss the right scope and a custom quote, not promise a result before reviewing your brief.

See our work →

Format and pacing profile

dominant format

Screen-recorded walkthrough with callouts

shot length

3-6 seconds

B-roll ratio

70:30 screen to face

pacing note

Each step gets a visible before and after; nothing is described that is not also shown.

Voice recorded close and dry, keystroke noise removed, no music under instruction.

Technical specifications

Transfer methodFrame.io, Dropbox, Drive, or S3
Folder structure/RAW /AUDIO /ASSETS /REFERENCE /EXPORTS
File namingYYMMDD_project_subject_take
Proxy resolution1/4 res H.264 for review
AudioSeparate WAV tracks per speaker
Brief locationOne document per project, in /REFERENCE
Project file deliveryRequested at end of engagement
Asset ownershipClient-owned storage from day one

Buyer context and objections

who buys

Editors, social managers and marketing teams doing the work in-house

typical budget

Free guide, retainers from $2,495/mo if you want it done for you

common objection

We can probably work this out ourselves

failed prior attempt

Copying a tutorial without adapting it to the destination platform

Our 5-step process

  1. 01

    Establish the target, the number or standard you are editing toward, written down.

  2. 02

    Configure the preset once so the decision is not re-litigated per project.

  3. 03

    Validate against one real asset before applying it to a batch.

  4. 04

    Measure, do not eyeball, the tolerance below is the pass/fail line.

  5. 05

    Document the setting for whoever edits next.

What to agree before you hire

We can probably work this out ourselves? Ask for a written deliverable list, relevant work samples, approval responsibilities and what happens when the brief changes. Copying a tutorial without adapting it to the destination platform is a reason to clarify those responsibilities, not a reason to buy more output without a plan.

Choose a measurable business goal alongside your content metrics. Track qualified enquiries and completed sales separately from views; neither a new edit nor a larger publishing schedule guarantees revenue.

Deliver footage like you want it edited

Five folders, consistent file naming and one brief document remove most of the back-and-forth from a project. Include a short note on which takes are preferred and which are unusable, editors otherwise review everything, and you pay for that review.

Separate audio tracks per speaker are worth the small extra effort at capture. Mixed-down audio removes the editor's ability to fix one person's level without affecting the other.

Own your assets from day one

Fonts, LUTs, caption presets, lower-third templates, logo files, licensed music certificates and the raw footage should all live in company-controlled storage. Vendors work from copies. This is not distrust; it is what makes a vendor change cost two weeks instead of two months.

Request project files at natural checkpoints, end of quarter or end of engagement, rather than at the moment of a difficult conversation.

Review in one place

Timestamped comments in a single review tool beat email threads, chat messages and screenshots every time. Consolidate all stakeholder feedback into one round before sending, and mark each note as required or optional.

The two most expensive review patterns are drip-feeding notes over several days and contradictory feedback from multiple stakeholders. Both are process problems, and both are solved by one owner consolidating before submission.

Turnaround estimator

Planning estimates depend on the inputs and assumptions, not guaranteed results or a final quote.

Edit complexity

Short-form turnaround

2 business days

Long-form turnaround

4 business days

Add one day per extra revision round beyond two.

All free tools →

Frequently asked questions

How should I organise footage for an editor?

Five folders, RAW, AUDIO, ASSETS, REFERENCE, EXPORTS, with consistent file naming such as YYMMDD_project_subject_take, plus a brief document in REFERENCE noting preferred and unusable takes. That structure typically saves an hour of billable review per project.

What is the best way to transfer large files?

Frame.io for review-oriented work, Dropbox or Google Drive for general transfer, S3 or similar for very large archives. Whatever you choose, keep one canonical location, footage scattered across WeTransfer links expires and is unrecoverable months later.

Should I send proxies?

Only if you already generate them. Editors normally create their own proxies from your originals, so sending only proxies means they cannot finish at full quality. Always send the originals; proxies are an optional convenience for review.

Do I own the project files?

You should, and we deliver them on request. Ask about it before signing anything. Project files, presets and brand assets in your own storage are what make switching vendors a two-week task rather than a rebuild.

How should feedback be delivered?

Timestamped comments in a single review tool, consolidated by one owner before sending, with each note marked required or optional. Drip-fed notes and contradictory stakeholder feedback are the two most expensive patterns in post-production.

How long should footage be retained?

Keep originals indefinitely in your own storage, repurposing old footage is the cheapest content you will ever produce. Vendors typically retain working files for 90 days after delivery, which is not a substitute for your own archive.

Let’s discuss File Delivery and Handoff

Send your website, goals and current content. We’ll discuss the scope, priorities and next steps before you commit.

Related pages

Explore across the whole site

Industry, platform, pricing, comparison, guide and tool pages that pair with this one.